Posts and top rail will be the dark gray of the doors. Foyer and Hallway color first coat on walls.

Stair Hall/Foyer colors blend well with LR/DR colors

Living Room Wall Color and French Doors – French Doors will be mounted in the LR on barn sliders to add visual interest coming into the foyer.

DR wainscoting changes the whole vibe of the room.

The new wainscoting is up in the Dining Room. I am super happy with how this turned out.

First Floor Half Bath – It’s coming back together. The bottom half will be beedboard with a heavy top trim piece. Wood floors will be refinished. White Farm Beadboard vanity and new toilet are ordered

Kitchen is insulated top and bottom and all closed up. Waiting on cabinets.

Opening the door up to match the height of the other two kitchen openings really works for the view to the back yard as well.

Upstairs hall color

Master Bedroom

Master Bath Closet trimmed out

Bedroom 1 color

Bedroom 2 color

Each Bedroom has the same sexy fan

New membrane roof for the back porch and kitchen annex

Another coat of vinyl to smooth out the edges

Soffits repaired with period-correct beadboard

Soffits!

Basement is ready for a new concrete floor. Tyvek up, gravel down!

Basement wrapped. French drains and sump installed. Dry as it can be down there!

Rear of house with doors painted. Looking good! The dirt mound is taking over the back yard!

New gutters and downspouts

Gutters!

We have parking!
Comments