Kitchen going in!

Kitchen going in!

Kitchen – you can see where the fridge will go.

The sliding door hardware is in and we can month the French Doors in a barn like fashion.

French Doors removed and will be mounted on sliders to add visual interest and safe space

Front porch has been fully sanded.

New lower level stairs.

Lots o wood for framing out the lower level

Lower Level hallway leading to full bath at end.

Standing in Media Room looking at bedroom wall and door opening

Looking into Bedroom which turned out to be a great size

As framing goes in a closet is made for the HVAC air handler


This picture shows the lower level closet and air handler to the left of that is the mud room

Bathtub and tile in process

Hall bath with “worlds largest niche” going in

Master Bath tile up!

The breakfast bar is ready!

Front of breakfast bar (kitchen side shows the base that was for these narrower wall cabinets to sit on. I am loving the wine rack

Breakfast bar

Kitchen phase II We have appliances!

Looking from old pantry towards from of house.

Hope to have it fully trimmed out with

Wood look ash grey tile 6×24 size –

New beadboard on walls and new 24 inch bead board vanity installed

Master Bath custom vanity

Master bath tile done


Hall bath tile done – penny tile on floor and 12/24 on walls

Lower Level Phase 2 – Media Room

Lower Level Bedroom (with big closet)

Lower Level bathtub is in!

Lower Level Bath – showing the vanity and toilet area going in to the right of tub.

Lower Level – Standing in media room looking towards staircase and the new HVAC air handler in its custom cabinet

The Lower Level Center Hall leading to bathroom at end, door is laundry room on right.

Lower Level – Media Room